Maximum Number of Achievable Transfer Requests SOLUTION

Maximum Number of Achievable Transfer Requests SOLUTION

We have n buildings numbered from 0 to n – 1. Each building has a number of employees. It’s transfer season, and some employees want to change the building they reside in.
 
You are given an array requests where requests[i] = [fromi, toi] represents an employee’s request to transfer from building fromi to building toi.
 
All buildings are full, so a list of requests is achievable only if for each building, the net change in employee transfers is zero. This means the number of employees leaving is equal to the number of employees moving in. For example if n = 3 and two employees are leaving building 0, one is leaving building 1, and one is leaving building 2, there should be two employees moving to building 0, one employee moving to building 1, and one employee moving to building 2.
 
Return the maximum number of achievable requests.
 
 
Example 1:
 
Input: n = 5, requests = [[0,1],[1,0],[0,1],[1,2],[2,0],[3,4]]
Output: 5
Explantion: Let’s see the requests:
From building 0 we have employees x and y and both want to move to building 1.
From building 1 we have employees a and b and they want to move to buildings 2 and 0 respectively.
From building 2 we have employee z and they want to move to building 0.
From building 3 we have employee c and they want to move to building 4.
From building 4 we don’t have any requests.
We can achieve the requests of users x and b by swapping their places.
We can achieve the requests of users y, a and z by swapping the places in the 3 buildings.
Example 2:
 
 
Input: n = 3, requests = [[0,0],[1,2],[2,1]]
Output: 3
Explantion: Let’s see the requests:
From building 0 we have employee x and they want to stay in the same building 0.
From building 1 we have employee y and they want to move to building 2.
From building 2 we have employee z and they want to move to building 1.
We can achieve all the requests. 
Example 3:
 
Input: n = 4, requests = [[0,3],[3,1],[1,2],[2,0]]
Output: 4
 
 
Constraints:
1 <= n <= 20
1 <= requests.length <= 16
requests[i].length == 2
0 <= fromi, toi < n
 

March Long Challenge 2021 Solutions

April Long Challenge 2021 Solutions

Codechef Long Challenge Solutions

February Long Challenge 2021

1. Frog Sort Solution Codechef

2. Chef and Meetings Solution Codechef

3. Maximise Function Solution Codechef

4. Highest Divisor Solution Codechef

5. Cut the Cake Challenge Solution Codechef

6. Dream and the Multiverse Solution Codechef

7. Cell Shell Solution Codechef

8. Multiple Games Solution Codechef

9. Another Tree with Number Theory Solution Codechef

10. XOR Sums Solution Codechef

11. Prime Game Solution CodeChef

12. Team Name Solution Codechef

January Long Challenge 2021

November Challenge 2020 SOLUTION CodeChef

October Lunchtime 2020 CodeChef SOLUTIONS

RELATED :

Related :

Related :

Leave a Comment